Homepage | Set Home | Add to Favorites
Member

Changshu Tongrun Logistics Equipment Co. Ltd


Products
  • No Category
Search
 

Friends links
  • No link

Stainless tool cabinet with all ball bearing slides and heavy duty side handle
Click image to view full size image
Product: Views:76Stainless tool cabinet with all ball bearing slides and heavy duty side handle 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-10-08 13:02
  Inquiry
Details
Model Number: TBR4307B-S Brand Name: Torin Key Specifications/Special Features: TBR4307B-SDimensions:Overall: 680*470*780mm, 26.8*18.5*30.7inOverall with casters: 680*470*935mm, 26.8*18.5*36.8in
  • Package: 750*530*870mm, 29.5*20.9*34.2in
  • 6 drawers: 570*410*83mm, 22.4*16.1*3.3in
  • 1 drawer: 570*410*170mm, 22.4*16.1*6.7in
  • Capacity: 147,620 cubic.cm, 9056 cubic.in
  • Net weight: 63.0kg/138.8lbs
  • Gross weight: 65.8kg/145.0lbs
  • 20’ container: 82pcs
  • 40’ container: 171pcs
  • Features:
    • All ball bearing slides
    • Gas shock lid stay
    • Heavy duty side handle
    • 2 swivel and fixed 5'*1.5' PU casters bearing 1,500lbs
  • Company introduction:
    • Professional metal supplier ESP
    • Material handling and storage equipment to offer customer’s with best solutions
    • Over 10-year experience on big orders with those famous auto manufacturers, Renault and Toyota
    • Wide range of various handling and storage equipment to meet customer’s requirement
    • With all welding made by automatic robots to make sure quality in every step of way
    • Nice at OEM products, capable to design for customer’s to save cost by making full use of room and improve efficiency
    • Strong financial ability supported by our mother company Jiangsu Tongrun with 60-year history
  • Packing:
    • Carton size: 1520*645*1250mm or 59.8*25.4*49.2-inch
    • Net weight: 154.3kg/340.3lbs
    • Gross weight: 185.3kg/408.6lbs
  • Loading:
    • 40ft HQ container: 50 pieces
  • Shipping Information:
    • FOB Port: Shanghai
    • Lead Time: 30 - 40 days
    Main Export Markets:
    • North America
    • Mid East/Africa
    • Central/South America
    • Asia
    • Australasia
    • Eastern Europe
    • Western Europe
    Inquiry